![]() The adjusted back site breaks the head peek to B Main while also giving players new cover to work with.The new cover on the pillar allows for new pre and post plant opportunities.Added cover to the pillar on B Site, blocked off the back site with a new wall, and added a stack of crates to B Wall.This change simplifies the space and removes the extra pocket.Plant site extension is also to match the new shape of the pool.Extending the pool should make playing in this space more comfortable. The cover changes should give defenders both a safe place to fall back to and more cover on retakes.Adjusted cover on the back of A Site and extended the pool to the far wall.This provides some cover for attackers pushing the cave while also giving defenders more options for contesting the space. ![]() ![]() It also removes the 50/50 when both entering or exiting the cave, allowing you to be more methodical when pushing.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |